McKale Rm 233

The former AD’s office and lobby area were remodeled for the Volleyball Coach and Staff.

Image
Remodeled McKale Room 233

The former AD’s office and lobby area were remodeled for the Volleyball Coach and Staff.

Changes inside the office were mostly aesthetic, including removal of some photos, vinyl graphics,  and wooden wall accents, changing location of the TV in the room, and a fresh coat of paint on all walls.

In the lobby area we added a new 10’x10’ office for one of the coaching assistants - a metal frame/drywall/insulation build out.  We re-used existing wooden crown and cove base on the outside of the new office to maintain the lobby’s existing aesthetic, relocated the cat paw print ceiling tiles to create a new pathway on the ceiling, and repainted the lobby and office walls.

 

Before

Image
McKale - Rm 233 Before 2

After (removed graphics, moved TV, and repainted wall)

Image
McKale - Rm 233 After 2

Before

Image
McKale - Rm 233 Before 4

After (removed graphics and accents, repainted wall)

Image
McKale - Rm 233 Before 4

Before

Image
McKale - Rm 233 lobby Before

After (added office)

Image
McKale - Rm 233 After 5